Module 7CN007 Strategic Construction Project and Programme Management
Assessment Number 1
% of module mark 100%
Hand-in – what? Report and Presentation
Hand-in- where? Canvas Upload Task
Pass mark 50%
Method of retrieval Resit – July 2021
Learning outcomes:
Learning Outcome 1 Work, lead and manage within an effective team
environment whilst assisting the client with the creation of the business case to support the programme or project.(CLO3)
7CN007 Strategic Construction Project And Programme Management Assignment-UK.

7CN007 Strategic Construction Project And Programme Management Assignment

Learning Outcome 2 Deal with complex issues both systematically and
creatively, make sound judgements in the absence of complete data and communicate their conclusions clearly to specialist and non-specialist audiences using a variety of skills and media appropriately (CLO6)

Learning Outcome 3 Appraise, critique and evaluate the advantages of the art and science of effective and efficient programme and project management within a variety of strategic contexts (CLO1)

Case Study and Tasks
This is an individual assignment that has several sections contained within one report and appended evidence – a portfolio. (6000 words maximum). Cover sheets, abstracts, reference lists and appended information are not considered part of the word count. You will need to fully apply aspects known about the project and apply modern methods of strategic construction project management in order to answer this brief. The work must demonstrate engagement with academic debate and justification for assumptions and conclusions reached.

Project Background
The owners of a private educational institution – a technical college with a focus on IT and Technology has acquired a 12 acre brownfield site on the outskirts of a large town in your Country. They have a vision for the creation of a secondary school and a higher education facility that incorporates all levels through secondary and further education and culminate with higher education teaching research and awards to PhD
level.

They have had some concept work done by architects that suggests that, for many reasons including legal, they need to create separate projects to accommodate the secondary school equivalent for ages 11 to 18 and that the 18 plus building should accommodate both further and higher education facilities. The combined college site will give opportunities for sharing of infrastructure, specialist and support facilities together with support from the local council who have included this in their 10 year
vision and proposed nearby plans for new residential, leisure and commercial sites together with transport changes such as rerouting of busses, metro stops and car parks.

7CN007 Strategic Construction Project And Programme Management Assignment-UK.

7CN007 Strategic Construction Project And Programme Management Assignment

The college owners are keen to include the latest technology and environmental considerations within the projects as they plan for their business into the middle of the century. They have a vision that includes two large buildings with targets of 1500
student for the secondary and 2500 students for the tertiary colleges. Facilities for general and specialist spaces need to be included at each level. There needs to be consideration for combined staff and support/administration areas. Their requirements for infrastructure include play and sports areas, a sports hall and swimming pool, underground car parks for staff and visitors and parking for parents.
They need hard and soft landscaping, lighting, security.

The buildings and infrastructure must comply with standards that provide a zero carbon and nitrogen footprint whilst being artistic and attractive. As the business has a technology and IT focus, the projects must also incorporate the latest technologies with vision and capacity for the future.

They have a vision for the creation of a secondary school and a higher education facility that incorporates all levels through secondary and further education and culminate with higher education teaching research and awards to PhD level. They have had some concept work done by architects that suggests that, for many reasons including legal, they need to create separate projects to accommodate the secondary school equivalent for ages 11 to 18 and that the 18 plus building should accommodate both further and higher education facilities. They have a vision that includes two large buildings with targets of 1500 students for the secondary and 2500 students for the tertiary colleges.

The Task
With little experience within the client team of construction and development of new buildings and only a small estate and maintenance team, they are anxious for some guidance on the project management of this strategic vision. They have ideas and strategic business plans that provide a budget of circa £40 million over 5 years and the primary completion of the secondary school project within 24 months.

Following an expression of interest application by your company, the client has asked for a paper and presentation based on the scenario above. Based on the initial vision of the client you have been asked to write an initial report advising the client on

1.Master-planning or programme management with regard to managing multiple projects in order to achieve strategic objectives (2000 words or equivalent)(40%)
2.The role and appointment of a professional advisory team, management of the stakeholder team and the client and a critical evaluation of the role of a strategic project manager (client-side) in the context of the complex
construction projects. (4000 words or equivalent) (60%)

The focus of this module is on the strategic management of projects. In this case, the feasibility project (pre-contract) that leads to a master plan of phased delivery of construction projects within the context of the business of the client.

The Task
With little experience within the client team of construction and development of new buildings and only a small estate and maintenance team, they are anxious for some guidance on the project management of this strategic vision. They have ideas and strategic business plans that provide a budget of circa £40 million over 5 years and the primary completion of the secondary school project within 24 months.
Following an expression of interest application by your company, the client has asked for a paper and presentation based on the scenario above. Based on the initial vision of the client you have been asked to write an initial report advising the client on ;

  • Master-planning or programme management with regard to managing multiple projects in order to achieve strategic objectives
  • The role and appointment of a professional advisory team, management of the stakeholder team and the client and a critical evaluation of the role of a strategic project manager (client-side) in the context of complex construction projects.
    The focus of this module is on the strategic management of projects. In this case, the feasibility project (pre-contract) leads to a master plan of the phased delivery of construction projects within the context of the business of the client.

7CN007 Strategic Construction Project And Programme Management Assignment-UK.

7CN007 Strategic Construction Project And Programme Management Assignment

General guidance

  • Always keep the topic in mind when writing, and ensure you stay within the specified word count.
  • Contents pages, references and appended articles are not included in the word count.
  • A competent command of English as a written language is expected. This includes a high standard of spelling, punctuation and neat presentation.
  • Reports may vary enormously in the way they are written but should maintain both an academic and professional standard. The report should encompass originality, imagination and clarity of thought and a critically argued position within the bounds of sound scholarship and well-documented research.
  • Consideration will be given to the shape and structure of the report and your ability of to keep to the point and demonstrate care and effort.
  • You should carefully research and critically analyse the topic, consulting a range of good quality, academic, identifiable sources of information. All quotes and sources should be cited in the text and listed at the end of the report using the Harvard Referencing style.
  • Do not plagiarise material. Plagiarism software and the internet can easily identify material published online. Essays containing plagiarised material will attract a 0% grade with the resulting academic misconduct proceedings.
  • Uploaded assignments must be presented in an A4 size using 1.5 line spacing and 12 point font with justified margins. Each page must contain your student number, module number, topic area and a page number within the header and/or footer sections
  • Upload a copy of your report to Canvas using the upload task set up within the module topic.

ORDER This 7CN007 Strategic Construction Project And Programme Management Assignment NOW And Get Instant Discount

Order Your Assignment

 